Commercial 3-Phase Power Installation & Cable Tray Infrastructure for Logistics Hub in Luton


An efficient logistics operation relies heavily on robust, scalable power infrastructure. For this project, EIS Electrical was contracted by a major logistics business based in Luton to deliver a comprehensive power expansion. The client required an upgraded electrical feed to support their external fleet operations, specifically high-capacity 3-phase power lines for specialized refrigeration vehicle charging points.
To meet their rigorous operational demands, our team executed a high-spec industrial installation from the ground up. We added entirely new high-power circuits, routing heavy-duty lines over a significant distance via a newly fitted galvanized cable tray system. The project culminated in the installation and commissioning of dedicated, industrial-grade 3-phase power outlets, ensuring the logistics hub can run its temperature-controlled fleet smoothly with zero downtime.
Overhead Galvanized Cable Tray Containment
We installed a clean, durable containment pathway utilizing professional metal cable trays to route long cable runs safely across the warehouse facility framework.


Industrial 3-Phase Infrastructure Expansion
Engineered and integrated new circuits directly from the main distribution boards to provide steady, high load capacities across the entire terminal.


High-Capacity Fleet Charging Outlets
Positioned heavy-duty 3-phase industrial sockets explicitly tailored to handle the rugged, high-draw weather-proof requirements of refrigeration transport vehicles.


Rigorous Verification & Safety Compliance
Conducted end-to-end electrical testing and loop calibration to certify the system for continuous commercial operations.


Need a reliable commercial electrical partner for your next project? Contact EIC Electrical today!












