3-Phase Industrial Power & High Bay Lighting Infrastructure for Luton Manufacturing Unit


Industrial operations require maximum power reliability to handle heavy machinery and continuous utility loads without disruption. For this project, EIS Electrical delivered a comprehensive electrical infrastructure upgrade for a local industrial unit in Luton. The client needed to establish a stable, high capacity power network to supply multiple refrigeration units and 3-phase heavy machinery, alongside a complete high-bay lighting overhaul to optimize warehouse visibility and energy efficiency.
Our team designed and installed dedicated, heavy duty 3-phase Steel Wire Armoured (SWA) submain circuits capable of carrying substantial industrial loads. To ensure an organized and safe working environment, all cabling was routed cleanly through high-level industrial pathways. Alongside the power circuits, we installed high-efficiency industrial high-bay lighting units across the facility, drastically improving floor illumination for daily operations.




